sizeless
Work

Who we work with.

Civil engineering firms, district heating operators and utility companies document their sites with sizeless.

  • Prantl Roppen
    Prantl Roppen

    Earthworks and pipelines

  • Kliewe
    Kliewe

    Pipeline construction

  • Pfaffinger
    Pfaffinger

    Network construction

  • FUG Fernwärme Ulm
    FUG Fernwärme Ulm

    District heating

  • Hamburger Energiewerke
    Hamburger Energiewerke

    Energy utility

  • IEP Innovative Energie Pullach
    IEP Innovative Energie Pullach

    Geothermal district heating

  • Geothermie Unterhaching
    Geothermie Unterhaching

    Geothermal district heating

  • New sites are added every day.
A worker guiding a district heating pipe into a trench in Ulm
In the field | FUG Fernwärme Ulm

Fernwärme Ulm: planning starts on the first visit. 

FUG is converting its district heating network from steam to hot water. Until recently, every conversion started with an on-site appointment for five people: an account manager, a surveyor, two technical planners and an electrician. If anything was missed, a second visit was needed. Today, the account manager captures the building on the first visit with a smartphone. The data goes straight into the sizeless workspace. The technical planners start planning the pipes and the heat transfer station right away. The account manager can prepare the offer immediately, because all the required data is already available. 

  • One visit per building
  • One person instead of five
  • Planning and offer in parallel
A district heating trench in Hamburg
In the field | Hamburger Energiewerke

Hamburger Energiewerke: as-built records in days, not months.

Getting into tenants' cellars takes a lot of coordination. With sizeless, Hamburger Energiewerke only needs access once. Drawing is automated, and the results go straight into their GIS. For the first time, they have independent quantities to check against.

  • One visit per cellar
  • No manual drawing
  • GIS-ready data
Why teams switch

One site visit. No coordination with a surveyor.

  • One site visit, no coordination with a surveyor.
  • 72 hours from scan to ready-to-use results, centimeter-accurate against a professional survey.
  • Fewer people per measurement: your own crews, with the smartphone they already carry.
  • Complete 3D evidence before backfilling, including crossing lines and house entries.